Thursday, August 28, 2008 Free Registration Log-in to View Profiles
Empire Relations Group is a Premier Investor Relations Organization representing publicly-traded companies in their communications programs with existing shareholders and potential investors.
investments
OTCBB
OTCBB
Pressroom 
 
 Archived
 
 Non-Public Companies
 Consumer
 Energy, Environment & Natural Resources
 Financials
 Healthcare/BioTech
 Industrials
 IT & Computers
 Materials
 Telecommunications
 Utilities
 
 Public Companies
 Consumer
 Energy, Environment & Natural Resources
 Financials
 Healthcare/BioTech
 Industrials
 IT & Computers
 Materials
 Telecommunications
 Utilities
Search


Public Companies : Utilities


Macusani Yellowcake Inc.: Best Hole to Date-31.34 Metres of 0.2356% (4.71 Lb/T) U3o8-From Surface

Jun 25, 2008 - 12:36:01 PM

News Source MARKET WIRE

Email this article
 Printer friendly page
TORONTO, ONTARIO -- (MARKET WIRE) -- 06/25/08 -- Macusani Yellowcake Inc. (TSX VENTURE: YEL) -

Peter Hooper, President of Macusani stated: "These latest high-grade results, which are 1.6 kilometers to the West of the first holes, indicate that the high grade uranium mineralization is distributed over the whole 2 kilometer strike zone. This is very encouraging and adds credibility to our concept of building a large heap leach operation at Macusani."

Macusani Yellowcake Inc. ("Macusani") (TSX VENTURE: YEL) is pleased to announce that the Company has drilled the best hole to date containing 31.34 metres grading 0.2356 % (or 4.71 Lb/T) U3O8 from the ongoing drilling program at its Colibri II-III uranium property on the Macusani Plateau in southeastern Peru. These latest holes were drilled from the four drill collars - Platform 8 ("P08"), Platform 9 ("P09"), Platform 11 ("P11") and Platform 25 ("P25"). The locations of the drill platforms are shown on the Macusani web site.

As with the previous intercepts (see previous press releases dated November 12, and December 14, 2007 plus February 18, May 13, and June 12, 2008) each hole intersected multiple horizontally-oriented uraniferous zones at depths starting at surface down to 65.00 m. The uranium minerals are hosted in acidic volcanic rocks of rhyollite composition that cover large portions of the Macusani Plateau in "blanket like" formations from surface to a depth of approximately 100 m.

The assay results from our last ten holes are shown in the table below (Note: The interval lengths are measured along the core length and may not represent true widths.):

COL II PLATFORM 91 Borehole DD1 Vertical-P09-Col II           EOH 61.00m----------------------------------           -----------------------------------------------------------------From (m)    To (m)   Interval (m)      U3O8(%)     lb/t-------------------------------------------------------   0.00     16.60          16.60       0.1247     2.494  22.90     24.35           1.45       0.0080     0.160  26.70     31.50           4.80       0.0059     0.118-------------------------------------------------------2 Borehole DD2 North West-P09-Col II         EOH 61.20m------------------------------------         -----------------------------------------------------------------From (m)    To (m)   Interval (m)      U3O8(%)     lb/t-------------------------------------------------------   0.00     11.70          11.70       0.0371     0.742  27.70     29.60           1.90       0.0082     0.164  38.80     40.20           1.40       0.0066     0.132-------------------------------------------------------3 Borehole DD3 North East-P09-Col II         EOH 61.40m------------------------------------         -----------------------------------------------------------------From (m)    To (m)   Interval (m)      U3O8(%)     lb/t-------------------------------------------------------   0.00     15.80          15.80       0.0216     0.432  18.20     19.20           1.00       0.0076     0.152  25.00     25.70           0.70       0.0107     0.214  39.00     40.90           1.90       0.0050     0.100-------------------------------------------------------4 Borehole DD4 South East-P09-Col II         EOH 62.00m------------------------------------         -----------------------------------------------------------------From (m)    To (m)   Interval (m)      U3O8(%)     lb/t-------------------------------------------------------  16.60     17.60           1.00       0.0083     0.166  20.90     38.70          17.80       0.0291     0.582-------------------------------------------------------5 Borehole DD5 South West-P09-Col II         EOH 63.80m------------------------------------         -----------------------------------------------------------------From (m)    To (m)   Interval (m)      U3O8(%)     lb/t-------------------------------------------------------   0.00     31.34          31.34       0.2356     4.712-------------------------------------------------------COL II PLATFORM 111 Borehole DD1 Vertical-P11-Col II           EOH 64.80m----------------------------------           -----------------------------------------------------------------From (m)    To (m)   Interval (m)      U3O8(%)     lb/t-------------------------------------------------------   5.90     13.10           7.20       0.0873     1.746  19.50     21.80           2.30       0.0620     1.240  54.30     58.90           4.60       0.0072     0.144-------------------------------------------------------4 Borehole DD4 North West-P11-Col II         EOH 65.00m------------------------------------         -----------------------------------------------------------------From (m)    To (m)   Interval (m)      U3O8(%)     lb/t-------------------------------------------------------   4.10     19.60          15.50       0.0503     1.006  61.30     62.90           1.60       0.0056     0.112-------------------------------------------------------5 Borehole DD5 North East-P11-Col II         EOH 67.40m------------------------------------         -----------------------------------------------------------------From (m)    To (m)   Interval (m)      U3O8(%)     lb/t-------------------------------------------------------   5.20     13.25           8.05       0.0168     0.336  17.20     18.60           1.40       0.0281     0.562  23.00     26.80           3.80       0.0314     0.628-------------------------------------------------------COL II PLATFORM 254 Borehole DD4 North West-P25-Col II         EOH 60.80m------------------------------------         -----------------------------------------------------------------From (m)    To (m)   Interval (m)      U3O8(%)     lb/t-------------------------------------------------------   0.00      4.31           4.31       0.0158     0.316   7.22      8.06           0.84       0.0156     0.312   9.82     13.30           3.48       0.0124     0.248  14.85     15.85           1.00       0.0149     0.298-------------------------------------------------------COL II PLATFORM 83 Borehole DD3 South West-P08-Col II         EOH 61.68m------------------------------------         -----------------------------------------------------------------From (m)    To (m)   Interval (m)      U3O8(%)     lb/t-------------------------------------------------------   1.60      5.97           4.37       0.0277     0.554   9.63     11.57           1.94       0.0102     0.204  12.48     12.81           0.33       0.0166     0.332  14.28     14.50           0.22       0.0080     0.160  22.62     24.10           1.48       0.0168     0.336-------------------------------------------------------

Quality Control

The Company employs a QA/QC protocol on all aspects of its analytical procedures. Whole core samples are sent to SGS Laboratories Peru in Lima, Peru. Samples are taken in intervals depending on the geological boundaries and type of mineralization (veins, veinlets, stockwork, dissemination, non-mineralized) but usually not more than 1m per sample. Core samples are initially shipped to sample preparation laboratories in Juliaca, 800 km southeast of Lima. Following the preparation stage, the sample pulps are sent to analytical laboratories in Lima. CIMM Peru and SGS are ISO certified assay laboratories. The sampling program is designed to include an assay quality control routine comprising the systematic run of standards, blanks and duplicate samples.

The pulps are stored at present in Lima.

Mr.Ian Foreman P.Geo., of Foremost Geological Consulting, is the Qualified Person, as defined under National Instrument 43-101, for the Colibri Property and has reviewed the technical information used in the preparation for this release. All aspects of the exploration program, are supervised by Dr.Laurence Stefan, Ph.D. (Economic Geology), a Director of Macusani, who is responsible for all scientific and technical information.

About Macusani Yellowcake Inc.

Macusani controls over 20,000 hectares (2,000 km2) of mineral properties on the Macusani plateau in Peru.

There are 24,296,285 common shares of Macusani Yellowcake Inc. outstanding, 32,876,260 common shares, fully diluted.



The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

Contacts:
Macusani Yellowcake Inc.
Peter Hooper
President
(416) 360-3402
Email: peterhooper2@aol.com
Website: www.macusaniyellowcake.com



Top of Page | Main News Index | EmpireRelations.com Home Page EmpireRelations.com Selected Clients News

Come see our services. Copr. © 2005 Empire Relations Group, Inc.

Utilities
Latest Headlines
Renewable Energy Stocks Green Investor Podcast, With CEO of Industrial Biotechnology Corporation, Focusing on Brazilian Sugarcane Based Ethanol Chemicals and Fuels
Macusani Yellowcake is Pleased to Announce Another High Grade Intersection. The Top 6.45 Metres of Hole DD1 Vertical-P17 has a Grade of 4.060 lb/t. of U3O8
Atlantic Power Corporation Announces August 2008 Distribution
Pacific Energy Resources Ltd. Announces Results for the Second Quarter of 2008, Restatement of First Quarter 2008 Results and Conference Call
Florida Public Utilities Announces Results for the Second Quarter of 2008
Atlantic Power Corporation Announces Second Quarter 2008 Results and 2008 Cash Flow Guidance
Maine & Maritimes Corporation Announces Second-Quarter Results
York Water Company Announces Second Quarter and Six Month Earnings
Fortis Reports Second Quarter Earnings of $29 Million
Pennichuck Corporation Announces Third Quarter 2008 Common Dividend